TOCUMEN S.A.

Tocumen

The products listed below refers to projects with a total investment higher than the B/. 87.3 Millions estimated resume established by Tocumen S.A. and it is estimated that project implementation periods for 2016 and 2017.

All these projects are emblematic for the current administration of President Juan Carlos Varela, due to its high social impact for the country, helping to improve the quality of life of thousands of Panamanians and economic development in various areas of the country.

  • Hydrant systems for fuel distribution in Terminal 2.

    The project consists of the construction of the hydrant system for fuel distribution in Terminal 2, the work involves laying pipes, pipe paint to prevent contamination of fuel, installation of valves, hydrants and free positioning system.

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 7.5 million

  • Connecting the fuel distribution system in Terminal 2 Terminal 1 Full Farm.

    The project involves the interconnection of the fuel distribution system of the Fuel Farm T2 in T. Among the main activities to be implemented are: to propose a basic design based on the established requirements, excavation and filling of material, placement of grid , granular sub-base, concrete, pipe installation and system connections.

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 0.7 million

    Amount to executed in 2017: 6.3 million

  • Parking Phase 1 in Terminal 2 (1,200 units)

    Enable the field for the purpose of conditioning the 1,200 units required for parking space. This adaptation will be provided with facilities and facilities required to access the Tocumen International Airport in Terminal 2.

    Among the main activities to be implemented include: earthwork, construction of paved canal or ditch water outlet cord construction – gutter, supply and installation of concrete countertops for parking, construction of perimeter fencing to accommodate parking.

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 3.2 million

    Amount to executed in 2017: 4.8 million

  • Equipment, furniture and installation in Terminal 2 (FF & E)

    Project delivery and installation of furniture and equipment T2 is implementation of the specifications, determining the quantities and types of furniture and equipment, so that it would lead to an equipment that must respond to the needs and set service levels for the new South Terminal T2.

    TYPE OF PROJECT: Furnishings

    Amount to executed in 2016: 7.5 million

    Amount to executed in 2017: 21.3 million.

  • Reconstruction Made taxiway parallel to the runway 03L / 21R

    The scope of the project involves construction of two new rapid exit taxiways, demolition and reconstruction of taxiway TWY-E in a new location (minimum of 182.5 meters of runway 03L-21R). 23 meters wide with margins of 10.5 meters. Resistant pavement 105,000 m2. Pavement margins: 40.000 m2

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 3 million

    Amount to executed in 2017: 13.5 million

  • Construction of taxiway Solution Cruz in Terminal 2

    Consisting of the demolition, excavation, filling, placement of grid, granular sub-base, asphalt and marking for a total of approximately 34.000m2 19.000m2 resistant pavement and not resilient flooring and the demolition of approximately 2,000m2 of existing pavements.

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 7.4 million

    Amount to executed in 2017: 2.2 million

  • Design and construction of three tanks of fuel JET A1 25,000 BBL

    Design, supply, supply, construct, equip, etc. all jobs that include the construction of the foundation and fuel storage tank, including:

    • Design and build the foundation of a vertical tank according to national structural regulations and compliance with international standards as regards JET FUEL. This design must be approved by the contracting before the start of work.
    • To design, build and assemble three vertical storage tank for aviation fuel JET FUEL A according to the regulations cited in this document.
    • Painting the interior, exterior tank.

    TYPE OF PROJECT: Infrastructure

    Amount to executed in 2016: 9.9 million